Ray Gin Posted August 2, 2017 Share Posted August 2, 2017 People don't like that effect with the Roseburn seats... Quote Link to comment Share on other sites More sharing options...
AdilMan2016 Posted August 2, 2017 Share Posted August 2, 2017 Really appreciate all the photos from all the posters in here, very much appreciated. Quote Link to comment Share on other sites More sharing options...
jambos are go! Posted August 2, 2017 Share Posted August 2, 2017 Ah, cheers for that. I was thinking it was further West. Totally off-topic now, but I only recently found out about a stadium which did actually exist in Stenhouse. https://en.wikipedia.org/wiki/Stenhouse_Stadium Remember seeing the crumbling Tote Board when I used to walk through the path at the back of Prison to the Longstone inn around 1970. Think it was also used for Showjumping. Quote Link to comment Share on other sites More sharing options...
Marcus_Barkus Posted August 3, 2017 Share Posted August 3, 2017 Anybody know when the material was meant to arrive from Korea? Assuming it is over due with all this talk of Muddayfield Ill find out, Got a contact at the docks in Korea called Fu Kem Yung, I used to import high quality Kettles from Pyongyang Quote Link to comment Share on other sites More sharing options...
mac Posted August 3, 2017 Share Posted August 3, 2017 Ill find out, Got a contact at the docks in Korea called Fu Kem Yung, I used to import high quality Kettles from Pyongyang As my good friend Borat would say, "I'm very excite" Quote Link to comment Share on other sites More sharing options...
Bazzas right boot Posted August 3, 2017 Share Posted August 3, 2017 (edited) Mad red panels oot. Tbh, the red panels will look great, but it won't become clear until the corners are filled in. Edited August 3, 2017 by Rudi'sleftfoot Quote Link to comment Share on other sites More sharing options...
davieholt Posted August 3, 2017 Share Posted August 3, 2017 7th august I'm pretty sure Ann said the staging was being sent on 3 ships with the first arriving 7th august. I half remember her adding that the last was due around 15th. Could be wrong. Quote Link to comment Share on other sites More sharing options...
Serge Posted August 3, 2017 Share Posted August 3, 2017 Ill find out, Got a contact at the docks in Korea called Fu Kem Yung, I used to import high quality Kettles from Pyongyang If these two facts are true, they are both worthy of a thread of their own! Quote Link to comment Share on other sites More sharing options...
Jambof3tornado Posted August 3, 2017 Share Posted August 3, 2017 If these two facts are true, they are both worthy of a thread of their own!Pity neither are. Plenty will think so though.lol Quote Link to comment Share on other sites More sharing options...
ramrod Posted August 3, 2017 Share Posted August 3, 2017 If these two facts are true, they are both worthy of a thread of their own!Think the contacts name is a give away ,mildly amusing though Quote Link to comment Share on other sites More sharing options...
Gorgiewave Posted August 3, 2017 Share Posted August 3, 2017 Didn't he consider himself German? "Ethnically." What does it matter what people "consider themselves"? They are what they are, and may be more than one thing. Quote Link to comment Share on other sites More sharing options...
jb102 Posted August 3, 2017 Share Posted August 3, 2017 "Practice pitch to be used as a car park on match days." Red ash? Quote Link to comment Share on other sites More sharing options...
Rab87 Posted August 3, 2017 Share Posted August 3, 2017 Will there be temporary entrances for when we have our first home game, or do that plan to have the outside area finished by then? Looks like no work has been started in that regard. Quote Link to comment Share on other sites More sharing options...
Fultons Right Leg Posted August 3, 2017 Share Posted August 3, 2017 A family member of mine is an Engineering Surveyor. He?s doing a job at the distillery today inspecting a 1 million litre storage tank. It?s to be drained and then they?re sticking a camera inside to have a wee poke about. He told me it was all to do with Hearts new main stand but that?s all he knew. Can only assume it?s something to do with the fabled safety certificates?Not massively interesting but there you go. Quote Link to comment Share on other sites More sharing options...
scottg71 Posted August 3, 2017 Share Posted August 3, 2017 Extremely doubtful this will be ready in 5 weeks. I've heard they won't get a safety certificate from the council. Looks like we'll be playing 4 games at Murrayfield Sent from my iPhone using Tapatalk Quote Link to comment Share on other sites More sharing options...
kila Posted August 3, 2017 Share Posted August 3, 2017 Extremely doubtful this will be ready in 5 weeks. I've heard they won't get a safety certificate from the council. Looks like we'll be playing 4 games at Murrayfield Sent from my iPhone using Tapatalk It won't be 4 games at Murrayfield It may be tight for the Aberdeen game but it's 2 weeks until the Partick game after, then the international break so the St Johnstone game isn't until the 21st Oct. I'd be amazed if the stand still wasn't in a usable state come then! Quote Link to comment Share on other sites More sharing options...
CJGJ Posted August 3, 2017 Share Posted August 3, 2017 Extremely doubtful this will be ready in 5 weeks. I've heard they won't get a safety certificate from the council. Looks like we'll be playing 4 games at Murrayfield Sent from my iPhone using Tapatalk As they have not yet applied for one I doubt you have heard anything except hot air leaving your backside Quote Link to comment Share on other sites More sharing options...
scottg71 Posted August 3, 2017 Share Posted August 3, 2017 As they have not yet applied for one I doubt you have heard anything except hot air leaving your backsideThey have been told they won't get one with what they are proposing. There will be a statement soon.Stick to Bears Den Hun Sent from my iPhone using Tapatalk Quote Link to comment Share on other sites More sharing options...
jambos are go! Posted August 3, 2017 Share Posted August 3, 2017 Saw sections of steps being offloaded yesterday morning. Quote Link to comment Share on other sites More sharing options...
Hagar the Horrible Posted August 3, 2017 Share Posted August 3, 2017 It won't be 4 games at Murrayfield It may be tight for the Aberdeen game but it's 2 weeks until the Partick game after, then the international break so the St Johnstone game isn't until the 21st Oct. I'd be amazed if the stand still wasn't in a usable state come then! as long as we are in before the Rangers Game in Oct as we have 7 home games and one away, ot Sj J would give us 8 at home and only 2 away Quote Link to comment Share on other sites More sharing options...
BigC Posted August 3, 2017 Share Posted August 3, 2017 This thread and the other one are reeking of Leith tramps today. Quote Link to comment Share on other sites More sharing options...
Phil D. Corners Posted August 3, 2017 Share Posted August 3, 2017 It won't be 4 games at Murrayfield It may be tight for the Aberdeen game but it's 2 weeks until the Partick game after, then the international break so the St Johnstone game isn't until the 21st Oct. I'd be amazed if the stand still wasn't in a usable state come then! It better be ready for the St Johnstone game..... I'm flying back for that game. :-P Quote Link to comment Share on other sites More sharing options...
colinmaroon Posted August 3, 2017 Share Posted August 3, 2017 Extremely doubtful this will be ready in 5 weeks. I've heard via Leith they won't get a safety certificate from the council. Looks like we'll be playing 4 games at Murrayfield Sent from my iPhone using Tapatalk Quote Link to comment Share on other sites More sharing options...
scottg71 Posted August 3, 2017 Share Posted August 3, 2017 Extremely doubtful this will be ready in 5 weeks. I've heard via Leith they won't get a safety certificate from the council. Looks like we'll be playing 4 games at Murrayfield Sent from my iPhone using Tapatalk How original. It actually came from someone involved with the project. Anyone with any construction knowledge knows by looking at current progress that there's a awful lot to get done in 5 weeks to get it passed as safe to use. Not a big deal. Was always a very ambitious target Sent from my iPhone using Tapatalk Quote Link to comment Share on other sites More sharing options...
1971fozzy Posted August 3, 2017 Share Posted August 3, 2017 As they have not yet applied for one I doubt you have heard anything except hot air leaving your backside How do you know they haven't applied for one ? Quote Link to comment Share on other sites More sharing options...
Shanks said no Posted August 3, 2017 Share Posted August 3, 2017 How original. It actually came from someone involved with the project. Anyone with any construction knowledge knows by looking at current progress that there's a awful lot to get done in 5 weeks to get it passed as safe to use. Not a big deal. Was always a very ambitious target Sent from my iPhone using Tapatalk Have you looked at the timeline of the Wheatfield stand build? Quote Link to comment Share on other sites More sharing options...
Jambo, Goodbye Posted August 3, 2017 Share Posted August 3, 2017 Have you looked at the timeline of the Wheatfield stand build? How long did it take out of interest? Is there somewhere I can check out the timeline? Quote Link to comment Share on other sites More sharing options...
Mikey1874 Posted August 3, 2017 Share Posted August 3, 2017 Extremely doubtful this will be ready in 5 weeks. I've heard they won't get a safety certificate from the council. Looks like we'll be playing 4 games at Murrayfield You'll know about Celtic's difficulties then as well Quote Link to comment Share on other sites More sharing options...
corryjambo Posted August 3, 2017 Share Posted August 3, 2017 How original. It actually came from someone involved with the project. Anyone with any construction knowledge knows by looking at current progress that there's a awful lot to get done in 5 weeks to get it passed as safe to use. Not a big deal. Was always a very ambitious target Sent from my iPhone using Tapatalk So you are telling us that "someone" involved in the project told you this presumably in confidence and then you promptly post it on here. At what level of the project is this person involved. They must be very high up in the pecking order to know that the council will not give us a safety certificate five and a half weeks before it is due, and we will have to play 4 games at Murrayfield and we will not have a safety certificate before 21 October. Quote Link to comment Share on other sites More sharing options...
kila Posted August 3, 2017 Share Posted August 3, 2017 (edited) How long did it take out of interest? Is there somewhere I can check out the timeline? I posted this in the Aberdeen Murrayfield thread a few days ago: -- Using of the Wheatfield construction (shot by farin I think), here's some time stamps to give an idea of progress, particularly that in a few weeks of July. We have 5 weeks to go, and the roof construction is well underway, the steel almost done and the concourse well underway. The following time lapse was over an 8 week period: 4th June 1994: 8th July 1994: 15th July 1994: 29th July 1994: Edited August 3, 2017 by kila Quote Link to comment Share on other sites More sharing options...
Shanks said no Posted August 3, 2017 Share Posted August 3, 2017 How long did it take out of interest? Is there somewhere I can check out the timeline? there's a video earlier in the thread with associated dates. Quote Link to comment Share on other sites More sharing options...
Jambo, Goodbye Posted August 3, 2017 Share Posted August 3, 2017 Cheers Kila Quote Link to comment Share on other sites More sharing options...
Mikey1874 Posted August 3, 2017 Share Posted August 3, 2017 So you are telling us that "someone" involved in the project told you this presumably in confidence and then you promptly post it on here. At what level of the project is this person involved. They must be very high up in the pecking order to know that the council will not give us a safety certificate five and a half weeks before it is due, and we will have to play 4 games at Murrayfield and we will not have a safety certificate before 21 October. A date will be pencilled in for the checks for the safety certificate Council have always been accommodating and will need to be here But there is no evidence of a problem Quote Link to comment Share on other sites More sharing options...
Ray Gin Posted August 3, 2017 Share Posted August 3, 2017 (edited) I posted this in the Aberdeen Murrayfield thread a few days ago: -- Using of the Wheatfield construction (shot by farin I think), here's some time stamps to give an idea of progress, particularly that in a few weeks of July. We have 5 weeks to go, and the roof construction is well underway, the steel almost done and the concourse well underway. The following time lapse was over an 8 week period: 4th June 1994: 8th July 1994: 15th July 1994: 29th July 1994: Looking at the progress over the last few weeks, it looks like we'll be struggling. Well ahead of where we are at on the 8th and still not finished on the 29th. Edited August 3, 2017 by Ray Gin Quote Link to comment Share on other sites More sharing options...
poultry Posted August 3, 2017 Share Posted August 3, 2017 Cause the designer thought it looked good mate Well if that's the case i have news for him. It's no. Quote Link to comment Share on other sites More sharing options...
BigC Posted August 3, 2017 Share Posted August 3, 2017 Looking at the progress over the last few weeks, it looks like we'll be struggling. Well ahead of where we are at on the 8th and still not finished on the 29th. There are big differences though. The staging will be much lighter, which may make it easier to put in quicker. They could have more people on seat adding duty. The roof work is further ahead than it was on the Wheatfield build. Quote Link to comment Share on other sites More sharing options...
Jambo, Goodbye Posted August 3, 2017 Share Posted August 3, 2017 There are big differences though. The staging will be much lighter, which may make it easier to put in quicker. They could have more people on seat adding duty. The roof work is further ahead than it was on the Wheatfield build. Another wee difference is the 8th pic had no floodlights, the 29th pic does. We'll hopefully have less distractions and it'll be all hands on deck. I think they'll fully concentrate on the bare essentials, possibly making for a faster time than the Wheatfield. Quote Link to comment Share on other sites More sharing options...
Thomaso Posted August 3, 2017 Share Posted August 3, 2017 The red is baffling. Why red and not a different shade of maroon? Looks wrong. There is no "different shade of maroon" available Ray. These are enamelled toughened glass panels that come in a limited range of colours. Quote Link to comment Share on other sites More sharing options...
Thomaso Posted August 3, 2017 Share Posted August 3, 2017 They have been told they won't get one with what they are proposing. There will be a statement soon. Stick to Bears Den Hun Sent from my iPhone using Tapatalk Discussions have been held with the Council and all parties are clear on what needs to be completed to obtain a safety certificate. Quote Link to comment Share on other sites More sharing options...
Homme Posted August 3, 2017 Share Posted August 3, 2017 That last pic should have been the final product. Loads of terracing and fancy platinum seats at the middle of the stand Quote Link to comment Share on other sites More sharing options...
Thomaso Posted August 3, 2017 Share Posted August 3, 2017 How do you know they haven't applied for one ? They will not apply for a safety certificate until the works that Hearts/Council have agreed needs to be completed to obtain the safety certificate. Quote Link to comment Share on other sites More sharing options...
kila Posted August 3, 2017 Share Posted August 3, 2017 Looking at the progress over the last few weeks, it looks like we'll be struggling. Well ahead of where we are at on the 8th and still not finished on the 29th. Hence why we are playing the first few games away from home Anyone recall when the first game in front of the Wheatfield stand was? Quote Link to comment Share on other sites More sharing options...
Thomaso Posted August 3, 2017 Share Posted August 3, 2017 A date will be pencilled in for the checks for the safety certificate Council have always been accommodating and will need to be here But there is no evidence of a problem Correct Quote Link to comment Share on other sites More sharing options...
jambogjh Posted August 3, 2017 Share Posted August 3, 2017 "no hope in hell it'll be finished in time for the Aberdeen game" (quote yesterday from one of the construction crew) Murrayfield here we come. Quote Link to comment Share on other sites More sharing options...
Cut The Crap Posted August 3, 2017 Share Posted August 3, 2017 I hope we have suitable penalty clauses in place should contractors not meet the agreed schedule. Might even reduce the shortfall a little. Quote Link to comment Share on other sites More sharing options...
Jambo, Goodbye Posted August 3, 2017 Share Posted August 3, 2017 Hence why we are playing the first few games away from home Anyone recall when the first game in front of the Wheatfield stand was? Think it was mentioned earlier in the thread. A Derby which I think we lost Quote Link to comment Share on other sites More sharing options...
Disco Dave Posted August 3, 2017 Share Posted August 3, 2017 (edited) Correct Thomaso - What is your view on any potential delay to the schedule (being open by Aberdeen), not completion of the stand. You are the only person on here who is ITK from what I've read............ everything else appears to be hearsay/horseshit. Edited August 3, 2017 by Disco Dave Quote Link to comment Share on other sites More sharing options...
2205ian Posted August 3, 2017 Share Posted August 3, 2017 (edited) I hope we have suitable penalty clauses in place should contractors not meet the agreed schedule. Might even reduce the shortfall a little. I can only but laugh..........we have posters, including 1 certainly in the know, answering points in a clear & concise manner & then..............this sort clearly picked up from nowhere!!! The Club have contingencies in place, but despite not being ITK, I am confident that ALL contractors on site are trying their best to get the stadium finished to meet the demands of a safety certificate to allow the match vs Aberdeeen to be played at Tynecastle. It would be good to support the guys on site & please try to ignore the "a guy working there told me" type of posts. Edited August 3, 2017 by 2205ian Quote Link to comment Share on other sites More sharing options...
Thomaso Posted August 3, 2017 Share Posted August 3, 2017 Thomaso - What is your view on any potential delay to the schedule (being open by Aberdeen), not completion of the stand. You are the only person on here who is ITK from what I've read............ everything else appears to be hearsay/horeshit. All I can say is there will be an imminent announcement from the club. Quote Link to comment Share on other sites More sharing options...
Disco Dave Posted August 3, 2017 Share Posted August 3, 2017 All I can say is there will be an imminent announcement from the club. Thanks Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.