The Future's Maroon Posted August 27, 2017 Share Posted August 27, 2017 (edited) Anyone know what the seat design is going to be? More Hearts like the other stands? A giant HMFC across four of the sections? A 3D **** The Hibs? hopefully the latter Edited August 27, 2017 by The Future's Maroon Quote Link to comment Share on other sites More sharing options...
151 Posted August 27, 2017 Share Posted August 27, 2017 Too many people have replied so can't quote everyone By silly I mean the daft coloured panels on the side differing colours and sizes just looks daft in my opinion. But I of course agree it'll increase revenue for many a decade and means my sons will be able to take their sons to Gorgie and not some other place that we could have been served. But my opinion is those daft panels on the side look strange and out of place. Quote Link to comment Share on other sites More sharing options...
151 Posted August 27, 2017 Share Posted August 27, 2017 Only thing that looks silly is you Nice one. Wish I was like you. Quote Link to comment Share on other sites More sharing options...
Mid Calder Jambo Posted August 27, 2017 Share Posted August 27, 2017 I've always wondered what the waterfacing side of chancelot mill looked like. Chancelot Mill was a superb building not like that sewer. Quote Link to comment Share on other sites More sharing options...
JALBO Posted August 27, 2017 Share Posted August 27, 2017 Brillant pics form today. It looks more impressive with every passing photo. Thanks all. Quote Link to comment Share on other sites More sharing options...
gjcc Posted August 27, 2017 Share Posted August 27, 2017 Chancelot Mill was a superb building not like that sewer. I assume you realise I was referring to the current chancelot building? Not the old one. Quote Link to comment Share on other sites More sharing options...
jambopilms Posted August 27, 2017 Share Posted August 27, 2017 I know there is a delay with the seats however I did expect the rest to be roughly ready in a few weeks time minus the seats. Nowhere near it. Quote Link to comment Share on other sites More sharing options...
obua Posted August 27, 2017 Share Posted August 27, 2017 I know there is a delay with the seats however I did expect the rest to be roughly ready in a few weeks time minus the seats. Nowhere near it.Correct was never going to be ready for Aberdeen game. Quote Link to comment Share on other sites More sharing options...
Buffalo Bill Posted August 27, 2017 Share Posted August 27, 2017 Does the new published capacity of 20,099 take into account seats lost to the Wheatfield tunnel and press seats in the Wheatfield? Both of those are temporary and will be removed once the new stand is open. Quote Link to comment Share on other sites More sharing options...
obua Posted August 27, 2017 Share Posted August 27, 2017 Both of those are temporary and will be removed once the new stand is open.Tunnel may not be removed. Quote Link to comment Share on other sites More sharing options...
heartsfc_fan Posted August 27, 2017 Share Posted August 27, 2017 Tunnel may not be removed. What would they use it for? Dressing rooms stay in the Wheatfield? Quote Link to comment Share on other sites More sharing options...
obua Posted August 27, 2017 Share Posted August 27, 2017 What would they use it for? Dressing rooms stay in the Wheatfield?Changong rooms are in the new main stand,could be used for a variety of things,half time entertainment for example keep new tunnel clear for players. Quote Link to comment Share on other sites More sharing options...
hughesie27 Posted August 27, 2017 Share Posted August 27, 2017 What would they use it for? Dressing rooms stay in the Wheatfield?The dress8ng rooms are staying in the Wheatfield for community pitch use.The job they done one the tunnel with fairly nice brickwork and panelling would suggest that it will be staying too. Quote Link to comment Share on other sites More sharing options...
obua Posted August 27, 2017 Share Posted August 27, 2017 The dress8ng rooms are staying in the Wheatfield for community pitch use. The job they done one the tunnel with fairly nice brickwork and panelling would suggest that it will be staying too. Thats what I was suggesting. Quote Link to comment Share on other sites More sharing options...
Deans Jambo Posted August 27, 2017 Share Posted August 27, 2017 (edited) Changong rooms are in the new main stand,could be used for a variety of things,half time entertainment for example keep new tunnel clear for players.Do you mean the Wheatfield tunnel staying so can be used for the half time entertainment, kids teams etc and the new stand tunnel/changing rooms being for there intended use by matchday teams? That would make more sense. It may also be the case that the new dressing room fitting etc can be delayed as we have the Wheatfield to buy time for it to be done later. Edited August 27, 2017 by Deans Jambo Quote Link to comment Share on other sites More sharing options...
obua Posted August 27, 2017 Share Posted August 27, 2017 Do you mean the Wheatfield tunnel staying so can be used for the half time entertainment, kids teams etc and the new stand tunnel/changing rooms being for there intended use by matchday teams? That would make more sense. It may also be the case that the new dressing room fitting etc can be delayed as we have the Wheatfield to buy time for it to be done later. Its probably an option. Quote Link to comment Share on other sites More sharing options...
FarmerTweedy Posted August 27, 2017 Share Posted August 27, 2017 I know there is a delay with the seats however I did expect the rest to be roughly ready in a few weeks time minus the seats. Nowhere near it. I think they've changed the schedule of various elements of the build since the delay to the seat delivery became clear. For instance, I think the original plan would have had a lot more of the staging in by now, but when it became clear there weren't going to be seats to install on the staging for quite some time, I think they pushed the staging installation back a bit and got on with some other stuff instead, that maybe wasn't originally going to have been done prior to the Aberdeen game. Quote Link to comment Share on other sites More sharing options...
151 Posted August 28, 2017 Share Posted August 28, 2017 As much as I have been a critic of the outside and the lego brick effect on the sides, the inside is going to be a beast! The view from the Wheatfield will be tremendous seeing it full. Quote Link to comment Share on other sites More sharing options...
Jamboelite Posted August 28, 2017 Share Posted August 28, 2017 As much as I have been a critic of the outside and the lego brick effect on the sides, the inside is going to be a beast! The view from the Wheatfield will be tremendous seeing it full. Yeah i agree, as much as the outside has created debate see Tynie fully enclosed is going to be special. Quote Link to comment Share on other sites More sharing options...
Thomaso Posted August 28, 2017 Share Posted August 28, 2017 I think they've changed the schedule of various elements of the build since the delay to the seat delivery became clear. For instance, I think the original plan would have had a lot more of the staging in by now, but when it became clear there weren't going to be seats to install on the staging for quite some time, I think they pushed the staging installation back a bit and got on with some other stuff instead, that maybe wasn't originally going to have been done prior to the Aberdeen game. Correct. Quote Link to comment Share on other sites More sharing options...
Ray Gin Posted August 28, 2017 Share Posted August 28, 2017 Think it's good but it doesn't half look similar to the wheat field tho Aye weird that, almost like it was deliberate. Quote Link to comment Share on other sites More sharing options...
Athletes Feet Posted August 28, 2017 Share Posted August 28, 2017 Might be wrong, but I think/looks like the tunnel and surround bits are being patched over already (background of the Jon McLaughlin joins story), maybe no longer needed as the seats delay means the changing rooms will be ready in the new stand for November? http://www.heartsfc.co.uk/news/6149 Quote Link to comment Share on other sites More sharing options...
Samuel Camazzola Posted August 28, 2017 Share Posted August 28, 2017 Just for context, I'm going to compare our new glass facade with the outsides of the most recent built stands at other clubs. Come on. I'm sure Wernham Hogg were based in the Davie Cooper Stand. Quote Link to comment Share on other sites More sharing options...
hughesie27 Posted August 28, 2017 Share Posted August 28, 2017 Might be wrong, but I think/looks like the tunnel and surround bits are being patched over already (background of the Jon McLaughlin joins story), maybe no longer needed as the seats delay means the changing rooms will be ready in the new stand for November? http://www.heartsfc.co.uk/news/6149 Nice spot. Quote Link to comment Share on other sites More sharing options...
Jamborello Posted August 28, 2017 Share Posted August 28, 2017 (edited) Might be wrong, but I think/looks like the tunnel and surround bits are being patched over already (background of the Jon McLaughlin joins story), maybe no longer needed as the seats delay means the changing rooms will be ready in the new stand for November? http://www.heartsfc.co.uk/news/6149 I think that's the area that is being used as the technical areas, the tunnel is further to the left. Edited August 28, 2017 by Jamborello Quote Link to comment Share on other sites More sharing options...
Jambof3tornado Posted August 28, 2017 Share Posted August 28, 2017 Were the folk that sit in the area of the temporary dugout/tunnel not informed they would be moved back to their original seats as soon as possible? Must be somebody from there posts on jkb knows for sure. Quote Link to comment Share on other sites More sharing options...
Jambof3tornado Posted August 28, 2017 Share Posted August 28, 2017 I think that's the area that is being used as the technical areas, the tunnel is further to the left.It is indeed the technical area. Quote Link to comment Share on other sites More sharing options...
Gannet Posted August 28, 2017 Share Posted August 28, 2017 Should be set for some great close up pics, the hoarding round the site is being removed!! Quote Link to comment Share on other sites More sharing options...
fabienleclerq Posted August 28, 2017 Share Posted August 28, 2017 Was going to ask about the schedule changing due to the seat delay as obviously the composite stuff isn't going in as quick as would be needed. My other point would be going by recent photos Thomaso the glass work looks great. Good job. Quote Link to comment Share on other sites More sharing options...
Cade Posted August 28, 2017 Share Posted August 28, 2017 Credit to the main stand FB group Quote Link to comment Share on other sites More sharing options...
Buffalo Bill Posted August 28, 2017 Share Posted August 28, 2017 Great to see the place opening up a bit. The plans show one larger and one slightly smaller Hearts crest in the paving on the piazza area. Does anyone know how that will be inserted? Is it by brick, or somehow painted/sprayed onto the surface? Quote Link to comment Share on other sites More sharing options...
scuj1 Posted August 28, 2017 Share Posted August 28, 2017 Credit to the main stand FB group Fantastic Quote Link to comment Share on other sites More sharing options...
bam95 Posted August 28, 2017 Share Posted August 28, 2017 Credit to the main stand FB group Really hope this area is used as a pop-up supporters bar before games. I spend more money in the boozer than I do at Tyne. Looking great, HHGH Quote Link to comment Share on other sites More sharing options...
sairyinthat Posted August 28, 2017 Share Posted August 28, 2017 Really hope this area is used as a pop-up supporters bar before games. I spend more money in the boozer than I do at Tyne. Looking great, HHGH Blink your eyes and it transforms.Great photo's thanks. Quote Link to comment Share on other sites More sharing options...
kingantti1874 Posted August 28, 2017 Share Posted August 28, 2017 Tell me we've taken the opportunity to create a fantastic badge in that monoblock Quote Link to comment Share on other sites More sharing options...
maroonlegions Posted August 28, 2017 Share Posted August 28, 2017 Really hope this area is used as a pop-up supporters bar before games. I spend more money in the boozer than I do at Tyne. Looking great, HHGH Tynie Arms would be raging. Quote Link to comment Share on other sites More sharing options...
maroonlegions Posted August 28, 2017 Share Posted August 28, 2017 Tell me we've taken the opportunity to create a fantastic badge in that monoblock If so, wonder if it will be gobbed on like our original crest on the cobblestones on the High Street, which is meant to bring good luck.. FTH. Quote Link to comment Share on other sites More sharing options...
obua Posted August 28, 2017 Share Posted August 28, 2017 I think that's the area that is being used as the technical areas, the tunnel is further to the left.Correct. Quote Link to comment Share on other sites More sharing options...
scabber Posted August 28, 2017 Share Posted August 28, 2017 How are they going to secure the site at night . Can't surely going to leave it open there will be intruders all over the stadium .can you imagine the damage that can be done Quote Link to comment Share on other sites More sharing options...
Pans Jambo Posted August 28, 2017 Share Posted August 28, 2017 How are they going to secure the site at night . Can't surely going to leave it open there will be intruders all over the stadium .can you imagine the damage that can be doneI would think on a ?13m building site there would be security cameras and at least 1 "watchie". Quote Link to comment Share on other sites More sharing options...
marshallschunkychicken Posted August 28, 2017 Share Posted August 28, 2017 It is indeed the technical area. I didn?t realise until I saw it close up on Sunday that I?m going to be directly behind the technical area. Could be interesting. Quote Link to comment Share on other sites More sharing options...
Watt-Zeefuik Posted August 28, 2017 Share Posted August 28, 2017 Really hope this area is used as a pop-up supporters bar before games. I spend more money in the boozer than I do at Tyne. Looking great, HHGH Fantastic idea. Get some food carts in as well. Quote Link to comment Share on other sites More sharing options...
Selkirkhmfc1874 Posted August 28, 2017 Share Posted August 28, 2017 How are they going to secure the site at night . Can't surely going to leave it open there will be intruders all over the stadium .can you imagine the damage that can be doneThere's night watchman on site Quote Link to comment Share on other sites More sharing options...
Buffalo Bill Posted August 28, 2017 Share Posted August 28, 2017 (edited) BSB Structural Facebook page. Question re the last pic: Is it a trick of the light or have they replaced/re-painted the seats in Roseburn section H? Edited August 28, 2017 by Buffalo Bill Quote Link to comment Share on other sites More sharing options...
NANOJAMBO Posted August 28, 2017 Share Posted August 28, 2017 If so, wonder if it will be gobbed on like our original crest on the cobblestones on the High Street, which is meant to bring good luck.. FTH. Can someone photoshop "Levein Oot" onto that guy's board. Just kidding. Quote Link to comment Share on other sites More sharing options...
Nobreath Posted August 28, 2017 Share Posted August 28, 2017 Great to see the place opening up a bit. The plans show one larger and one slightly smaller Hearts crest in the paving on the piazza area. Does anyone know how that will be inserted? Is it by brick, or somehow painted/sprayed onto the surface? I'm sure I read on the plans a breakdown on brick colours they were going to use to create crest. Quote Link to comment Share on other sites More sharing options...
kingantti1874 Posted August 28, 2017 Share Posted August 28, 2017 Looks mint.. Will provide a monumental lift walking back into the place Quote Link to comment Share on other sites More sharing options...
Buffalo Bill Posted August 28, 2017 Share Posted August 28, 2017 How are they going to secure the site at night . Can't surely going to leave it open there will be intruders all over the stadium .can you imagine the damage that can be done I believe The Fist of Gorgie will be prowling the area. Quote Link to comment Share on other sites More sharing options...
scuj1 Posted August 28, 2017 Share Posted August 28, 2017 Question... Why have the steel beams been painted white in preparation for the composite material? Fire retardant or something similar? Quote Link to comment Share on other sites More sharing options...
maroonblood Posted August 28, 2017 Share Posted August 28, 2017 Quote Link to comment Share on other sites More sharing options...